Sweden Hyperscale Data Centre Water Infrastructure

Rainwater harvesting and snowmelt treatment delivered through standardised packaged plantrooms across multiple hyperscale data centre campuses in Sweden.
Whitewater Group delivered water treatment infrastructure across 11 hyperscale data centre projects in Sweden, providing the treated water required for evaporative cooling and humidification.

A standardised engineering approach enabled the solution to be repeated across multiple campuses, using packaged plantrooms and skid-mounted systems configured to suit individual site requirements.
The Challenge

The campuses had no connection to a municipal water supply. Instead, each site relied on rainwater and snowmelt collected in large underground storage tanks.

This created a variable raw-water source that had to be treated consistently to meet the requirements of critical cooling and humidification systems.

The challenge was to maintain water quality and system availability under changing demand conditions, while providing redundancy, minimising water consumption and integrating the treatment infrastructure with the wider data centre environment.

At a Glance

Location
Sweden
Sector
Data Centres
APPLICATION
Cooling and humidification water treatment
SCALE
11 × 40 MW data centre projects
Water Source
Harvested rainwater and snowmelt
DELIVERY
Modular packaged plantrooms and skid-mounted systems
OUTCOMES
– Up to 95% water recovery
– N+1 critical-system redundancy
– Standardised multi-site architecture
– 100% factory-tested systems
– Reduced on-site installation and testing

Standardised Multi-Campus Delivery

Whitewater Group developed a modular water treatment architecture that could be repeated across the programme while being configured around the requirements of each campus.

The treatment process combines filtration, UV disinfection and membrane treatment, supported by treated-water storage and distribution.

Where dedicated plantrooms were required, complete treatment facilities were manufactured and assembled off-site before being transported to site. Other projects used the same engineering architecture in skid-mounted format.

This approach created consistency in treatment technology, controls, equipment selection, commissioning and maintenance across all 11 projects.

Water Efficiency

Water recovery was engineered into the wider treatment strategy, reducing the requirement for new water and maximising the value of the harvested supply available at each campus.

The systems recover up to 95% of water from treatment and evaporative cooling and humidification waste streams. This reduces wastewater generation and extends the useful life of each cubic metre of harvested rainwater and snowmelt.

Combined with the wider treatment architecture, this supports greater water resilience while reducing the overall water demand associated with cooling operations. 

OPERATIONS & MAINTENANCE

Lifecycle Support

Whitewater Group's involvement extends from early design input through detailed engineering, off-site manufacture, installation, system integration, commissioning and handover.

Each system is factory tested before delivery, followed by a structured five-stage commissioning process with the client team and its representatives.

Ongoing preventative maintenance and technical support help maintain system performance, reliability and operational readiness throughout the lifecycle of the infrastructure.
“One engineered water treatment platform, standardised across multiple campuses and adapted to the requirements of each site.”

Related Case Studies

Start the Conversation

Speak to an expert today

The earlier we understand the project, the more value we can add.

Talk to Whitewater Group at concept or design stage to help define the right water and cooling strategy, identify opportunities for standardisation and off-site assembly, and reduce risk before construction begins.
Woman in a white hard hat inspecting an item on the wall
Copyright © 2026. All rights reserved.
Designed by TOTEM